The poles are up and the lights are shinning bright.

The wall in the in the basement is finished and the lights add a nice touch.

We installed these lights in the floor in the Gazebo.
And they look awesome.

We are installing lodge logs on this wall in the basement.

Dan is staining the doors going out to the four seasons room.

Bill is putting the track lights for the kitchen together.

Dan A. is getting the hang of cutting the corners on the baseboard and he's doing great at it.

Dan A. & Todd are working on perfecting their cuts on the window trim and base boards

Dan Jr. is almost done with the floor in the basement. Just a few more cuts!

Aaron & Todd are installing the doors in the finished basement.

Todd & Dan A. are starting to take to tape off the floor in the Gazebo. (Can't wait to see what it looks like!)

The saws are gone and Todd is sealing the floor in the four seasons room. What a difference.

Aaron started the track for the drop ceiling in the basement.

Dan Jr. is working hard on putting these 2*2 plywood tiles down in the basement.

Todd is thinking about what he is going to do next to finish up the log trim around the stairway.

Aaron is building a rounded step to step out into the newer part of the basement.

We built a special ledge around the top of the Gazebo so we could put these track lights up to illuminate the ceiling. (That's COOL!)

The tape is off; WOW! This custom made compass is a beautiful show piece.

Aaron and Francis are installing logs on the top of the counter to hide the steel support beams.

Dan Jr. took a few extra minutes to make sure these cuts fit perfect.


We need something to finish floor and the ceiling, so we worked together with Town & Country and we came up with these logs that were cut down to just right to make the perfect finishing touch.

The four seasons room is almost complete; all we have to do now is trim it out.

Aaron & Dan A. are working on putting the siding up in the four seasons room.

Todd is learning how to put the trim around the windows. (He's doing a great job)

Dan Sr. is laying tile around the stove.


Here is just a glimpse at the master bedroom.

This hardwood floor adds a beautiful touch to the main floor of the house.

The rail on the stairway is finished

Dan & Bill have started tiling the gazebo.

Dan is putting the under lament
down in the gazebo.

We used half logs to make a new stairway.

Dan Jr. is putting up some boards so we can put the new stairway up.

We are taking the old stairway off so we can make some new changes.

The banister is complete and ready to be stained.

Aaron is drilling the holes so he can put the spindles in place.

Dan A. and Todd are anchoring the poles in the platform.

Aaron and Todd are cutting the poles for the stairway.

Dan Jr. works hard to make these cuts perfect.

Aaron is getting everything to start installing the banister.

Dan Strouss & Bill Haworth are laying tile in the master bedroom shower.

This log mantle really sets this fire place off.

Aaron and Todd are starting to put some of the trim on the windows.

Bill Haworth is making sure these doors look perfect on this fireplace.

The kitchen floor has been sealed and grouted.

Jason from William North Company has been working with us to get all the plumbing up to date. (What a JOB!)

This beautiful counter top made of Zebra wood adds a special touch to this kitchen.

Matt from Zimmer's Marble company is putting the back splash on the counter.

The Granite has been installed in the kitchen and the sink has been cut in.

One wall in the shower is tiled.

The tile on the tub is finished and ready for grout.

The garden tube in the master bath is almost plumbed.

Dan is working on the tile in the Master Bath.

The ceiling is finished.

We are getting ready to put the wood up on this wall.

Progress on the wall is coming along great .

By the end of the day the wall was finished and the scaffolding was in the way.

This is a new kind of under lament that we put down for the master bathroom tile.

Dan is working on the hearth for the dinning room fireplace.

The guys are working on the ceiling in the master bedroom.

This is the deck for the bath tub in the master bedroom.