Whole Project

Last updated 8-20-07

FIRST PHASE

Second Phase

Click the links above for more pictures.

Now we're back outside finishing up the log siding and the decks. We are also building another Gazebo.

It's Finished!

The decks are done and the hot tub is installed.

Tom is putting the final touches on the Gazebo with a fresh coat of stain.

On the South end of the house we are building a deck beside the Gazebo, so we can sit a hot tub on it.

Baker's Fabercation build a Cast Iron rail for the balcony.

Birds eye view of the concrete patio. We stamped all the so it looks like stone walk ways.

Birds Eye view of the top of the Gazebo.

Aaron is putting on the roof boards.

All the logs are on and we are ready to run the wires and put the roof boards on.

Aaron & Bill are drilling holes so we can stand logs on top of these columns.

Dan Jr. is lifting the logs over to the guys with the JCB.

The guys are putting the top logs on to support the Gazebo.

Aaron is putting the last bolt in place. Now we are ready to set the log rafters.

Birds eye of the new Gazebo.

Aaron is trying to figure out a way to lift the rafters on the Gazebo.

Dan Jr. is bolting the rafters to the top hub.

This is the roof to walkway to the Gazebo.

Ted, Jeff, and Dave are working on a set of steps.

Dan Sr, Aaron, & Todd are putting supports in the rafters so we can put more rafters up.

The log rafters are all up.

The caps are set and the floor is down, now we are ready to set the poles.

Aaron & Bill are setting the Limestone caps so we can start putting this Gazebo together.

Now the guys are using a stamping the concrete.

The guys are coloring the concrete by dusting a green powder on it. (Wait until it's done.)

Can you tell this concrete is a different color?

Todd is putting on joist hangers. The new Gazebo is almost ready to be decked.

Ted Renfer's Construction Co. is getting ready to pour the patio.

We are getting ready to put the siding on the last section of the house.

Today we started building the floor for the Gazebo.

Todd & Dan A. are working putting the trex decking down on this upstairs porch.

The log siding is complete on the back of the house.

Aaron & Dan A. are laying out the gazebo so we can drill the holes for the pillars.

The pillars are in and the Gazebo is starting to take form. Also the log siding is almost complete on the the back side of the house.

This is the foundation for the new Gazebo.

These poles are the coolest part of this porch.

We've dug the hole so we can pour the retaining wall. This is also the future sight of the new gazebo.

This is the footings for the retaining wall we are building around the new Gazebo.

Dave Cook is pulling the cement into place in the new wall.

The cement is poured and the guys are smoothing off the cement.

The forms are off and these walls look good!

Dan Jr. & Todd are also putting the Trex decking down. We are using a new hidden fastener so there's not any screws showing.

This is a view of the porch from the back yard. (It's going to look really cool when the log column posts get put into place.

Aaron & Todd are cutting the log posts so they can put them into place.

Aaron & Dan A. are cutting the poles for the Gazebo.

This is the finished exterior of the first phase:

The gazebo's done.

The siding on the back of the house is done and what a difference it makes.

Aaron and Dan A. are putting up the corners on the upper part of the house so we can finish the back of the house.

Todd likes to do all the cutting.

Dan has the fun job of cutting around the windows.

The siding is going up quickly and it looks great.

Aaron and Dan Allen started working on the siding again today.

 